OWNER GUIDE / Handover preparation

Technical handover checklist

Prepare a structured document handover with clear versions, responsibilities and outstanding questions.

GENERAL OWNER PREPARATION / 03 SECTIONS

Agree what the handover should contain

Use the agreed project scope as the starting point for a handover document list. Ask which drawings, reports, material records, operating information or maintenance documents are relevant, and who will provide each one. Document requirements depend on the actual work and the parties involved; this guide is not a universal acceptance standard.

Make the package easy to navigate

Prepare an index with document titles, revision labels, issue dates and responsible contacts. Keep final issued documents separate from drafts and earlier versions, while retaining the record history. Check that the files provided can be opened and that a copy is available to the person responsible for the vessel’s records.

Record open items and next questions

Keep a separate list of missing documents, unanswered questions and agreed follow-up responsibilities. Ask the appropriate professional to explain any operating or maintenance information that is unclear. Checking off this preparation list only tracks document organization; it does not confirm technical acceptance, readiness for use or the vessel’s condition.

A NOTE ON SCOPE

This is general preparation guidance, not a vessel diagnosis, engineering specification or confirmation of compliance. Project-specific advice and deliverables require a separate professional discussion.